Parking Lot Closure

Construction on our back parking lot and new entrance from Niakwa Road will begin on Tuesday, September 13th.

During this first stage of construction, onsite parking will be limited to the front parking lot only.  We ask members to consider carpooling to reduce the required number of parking spaces.  Additional parking will be available:

  • Along Niakwa Road on the golf course side of the street
  • The FreshCo parking lot along the side facing Fermor Ave

The below images show the described area in the FreshCo parking lot, along with a walking map to the club (using the pedestrian bridge over the Seine River). 

Parking Lot View:

Walking Map View:  Click for directions.


Wade Nybakken,
General Manager

« back